M-Plaza, Munich, 德国

  • 建筑类型:
  • 停车场
  • 医院建筑
  • 办公楼宇
全屏地图 关闭

Munich's pioneering project for CO₂-neutral construction.

The M-Plaza is being realized as a Net Zero timber construction, which means that the building does not produce any CO₂ emissions over its life cycle. This is achieved by using state-of-the-art sustainable technologies and materials.

The M-Plaza is being built in the heart of Thalkirchen, Munich, and comprises 10 full floors as well as a roof terrace floor, which will allow users to take a break with breathtaking views. The building has a gross floor area of 41,000 m², providing plenty of space for innovation and creativity. The highly efficient standard floor extends over 4,500 m² and can be divided into up to five rental units with areas ranging from 360 m² to 794 m². Construction began in 2023 and completion is scheduled for 2025.

The construction consists of hybrid timber-concrete slabs in combination with DELTABEAM® Composite Beams from Peikko. The composite effect between concrete and steel in DELTABEAM® enables large spans with an 8.1 m column grid. With a room height of over 3 m, the M-Plaza offers flexible and spacious rooms that meet a wide range of requirements.

The project is a prime example of sustainability. It is powered by photovoltaic systems and geothermal energy and meets the highest environmental standards. It is certified to LEED Platinum, WiredScore and Efficiency House 40, underlining the building's outstanding energy efficiency and sustainability.

Peikko is proud to supply a wide range of products for the M-Plaza. In addition to DELTABEAM®, this includes bolted connections for precast concrete elements, ATLANT® Composite Columns, BESISTA® Tension and Compression Rod Systems, punching reinforcement and many other solutions.

When asked what was most important for the developer (FidCap Group Munich) in this project, he replied: "1. speed, 2. speed, 3. speed." The particularly simple and fast installation of Peikko products was therefore one of the essential advantages that convinced the project participants.

The M-Plaza is more than just a construction project. It is a symbol of a sustainable and innovative future, and we at Peikko are proud to be part of this pioneering development.

阅读更多 down-arrow.png

The cooperation with Peikko is at a very good level.

Michael A. Gerlich

项目概览

项目规模:
41.000 m2
楼层:
10
开发商:
FidCap Gruppe München
施工单位:
Ed. Züblin AG
结构设计师:
ASSMANN BERATEN + PLANEN GmbH
建筑师:
DÖMGES ARCHITEKTEN AG
交付年份:
2024-2025
完成时间:
2025

联系我们

Sascha Schaaf

Sascha Schaaf

Leitung Projektentwicklung

电话 +49 6436 916464
手机+49 175 271 2173
[email protected]