Castelein's new distribution centre in Puurs is build with concrete columns of almost 30 meters in length, Normally, the organisation concercing temporary bracing is a lot of work, but with Peikko's bolted connections a lot of precious time, materials and space was saved. Because no temporary bracing was needed, the building site was easily accessible for the workers and transports.