Cooling tower for Gimpo Combined Heat and Power Plant, Kimpo, 韩国

  • 建筑类型:
  • 能源设施
全屏地图 关闭

This is Peikko’s second cooling tower project in South Korea and has a great significance because of the first public project.     

One of the main benefits of using Peikko's solutions in this project was the fast erection stage: using the precast concrete construction process together with Peikko's concrete connection items was more than two months faster compared to cast-in-situ construction, and without any incidents during the construction period. In addition to the cooling tower, Peikko products were applied to the TR wall system.

The order comprised a notable amount of HPM® Rebar Anchor Bolts, HPKM® Column Shoes and COPRA® Anchoring Couplers for column connections, as well as SUMO® Wall Shoes and PVL® Connecting Loops for wall connections for the project. 

The main contractor of the project was Doosan. The precast elements for the project were supplied by Korea Concrete Industry, and the subcontractor responsible for the precast frame erection was Taehwa. Peikko’s deliveries started in March 2022. 

阅读更多 down-arrow.png

项目概览

项目规模:
10 cooling towers m2
开发商:
Korea Westen Power
施工单位:
Doosan Enerbility
结构设计师:
Miral Engineering
建筑师:
IIL D&T
构件生产商:
Korea Concrete Industry
交付年份:
2023
完成时间:
2023
风电机尺寸, MW:
470

我们提供的解决方案

联系我们