Eikenott, Gland, 瑞士

  • 建筑类型:
  • 住宅楼宇
  • 停车场
全屏地图 关闭 街景视图

Peikko provided an efficient construction method for Eikonott Gland. Speed and technically advanced details convinced the total contractor Losinger-Marazzi to use Peikko's Column Connection solution. Solution consisted of HPKM®-Column Shoes and HPM® Anchor Bolts which were used in oval shape columns. 

Peikko's Column Shoes were helpful in speeding up the whole construction process. Now building seems almost like a LEGO-game.

Bertrand Faucherre, Didier Bourqui

项目概览

项目规模:
20 000 m2
楼层:
4
施工单位:
Losinger-Marazzi
构件生产商:
Bétontec
交付年份:
2012
完成时间:
2014

我们提供的解决方案

联系我们