Eumseong Combined Power Plant Cooling Tower Project, Eumseong-gun, Chungcheongbuk-do, 韩国

  • 建筑类型:
  • 能源设施
全屏地图 关闭

This project marks Peikko’s third cooling tower project in Korea, and it holds particular significance as a public-sector project.

One of the key benefits of applying Peikko’s solution to this project was the remarkable speed of installation. By combining precast concrete construction with Peikko’s innovative connection systems, the overall construction period was reduced by more than two months compared to traditional cast-in-place methods. Moreover, the entire project was completed without any safety incidents.

The site was visited by representatives from universities, corporations, and public institutions, all of whom gave positive feedback on Peikko’s dry joint solution for precast concrete. This project clearly demonstrates how Peikko’s technology can enhance both efficiency and safety in modern construction.

阅读更多 down-arrow.png

项目概览

项目规模:
10 cooling towers m2
开发商:
KOREA EAST-WEST POWER CO.,LTD
施工单位:
POSCO E&C
结构设计师:
RISE STRUCTURAL ENGINEERING
建筑师:
TAEHWA ENGINEERING CO., LTD (SHOP DESIGN)
构件生产商:
KOREA OCEAN PLATFORM CO.,LTD
交付年份:
2023~2024
完成时间:
2024