Logistic centre, Middelfart, 丹麦

  • 建筑类型:
  • 仓储建筑
全屏地图 关闭 街景视图

13.5 metres high columns installed without temporary bracing

In Middelfart, Willy Naessens is constructing a new and flexible logistics centre that can be adapted to the needs of individual tenants. The first tenant will bring together 7,000 m² of warehouse and office space in the new building. The remaining areas will be constructed and fitted out as new tenants move in.

For all columns in the building, the Belgian contractor Willy Naessens chose HELKA® Column Shoes and HPM® Anchor Bolts from Peikko. The solution enables fast and efficient erection, with each column installed in just 10 minutes and able to remain standing without temporary bracing.

“When a column can be installed in just 10 minutes and remain standing without temporary bracing, the erection process can continue quickly and efficiently. This also creates more space for workers and machinery, making it easier to carry out the subsequent construction work.”

Andreas De Neve, Site manager, Willy Naessens

 

The fast erection reduces crane time, labour requirements and the overall construction time, while also making quality assurance simpler and faster. As no temporary bracing is required, there is more space and improved safety on site, allowing workers and machinery to operate more freely. Work can also progress more quickly, as other elements, such as beams and walls, can be installed without waiting for the temporary column bracing to be removed.

The result is an efficient construction process with significant savings in both time and costs.

阅读更多 down-arrow.png

When a column can be installed in just 10 minutes and remain standing without temporary bracing, the erection process can continue quickly and efficiently. This also creates more space for workers and machinery, making it easier to carry out the subsequent construction work.

Andreas De Neve, Site manager, Willy Naessens

项目概览

项目规模:
50,000 m2
楼层:
2
开发商:
Prohuis
施工单位:
Willy Naessens Industribouw
建筑师:
Bias Architecten
构件生产商:
Willy Naessens Industriebouw
交付年份:
2026
完成时间:
2026

我们提供的解决方案

联系我们

Morten Gyllensten Havndrup

Morten Gyllensten Havndrup

电话 +45 3160 7085
[email protected]