Peikko Group Global (English)
The RHKW waste burning plant in Linz, Austria was built with a precast concrete frame connected with Peikko’s Anchor Bolts, Columns Shoes and Beams Shoes. Peikko also delivered a substantial amount of Fastening Plates to the site.
Günther Pock
Vertrieb & Anwendungsberatung West
guenther.pock@peikko.com
本网站使用cookies。使用本站点表示您同意我们使用cookies。请查阅我们的cookie政策了解更多详情。